After some slight adjustments to Adventure’s wing alignment to correct the rollimg/control issues the craft was having, the craft takes off again!

This time, Jeb, Bill, and Bob head up – the mission is solely to test Adventure’s systems before construction of additional Crew Shuttles to service the KSS! This will be the first flight with the craft’s new solar panels – so far, they don’t seem to be affecting aerodynamics. 
“OK – the Station is right where it should be! Heading in to dock!” -Jeb
Jeb pilots the Adventure closer, and closer to the Space Station!

Almost there…

Success! Adventure makes a good seal with Docking Port 1. Everyone heads over to the station to check things out!
“Wow! This place sure looks different than last time!”
-Jeb
Does it? Must be a slight case of space madness…














Construction begins at once, with an automated launch scheduled immediately after the first vehicle is made.
Kimmy, Jebediah, and Orlas return from the KSS! They rest up, and get ready for flights beyond Kerbin!
The X-5 blasts off, carrying Mitster and Robart to the next anomaly detected by the overhead satellites.


Aurora 9 returns home! 