Year 23, Day 329 (Lobert and Summer Land on Mun!)


Aurora 29 Mission Summary

  • Crew: Mission Commander Summer, Mission Scientist Gilian, Mission Engineer, Lobert .
  • Mission: Crewed mission to Mun. Land near Polar Mun Crater on Mun, perform scan with large scanning arm, return data to Kerbin.

Summer fires the Aerospike engine, and the lander begins its descent to the polar region of Mun!

The lander continues its descent – heading closer and closer to Mun’s craggy surface!

The lander is mere meters from the surface!

Summer and Lobert go through the landing checklist – shutting down the engine, locking RCS system, making sure all their space suits are on snug, extend the landing ladder, activate communication systems, open side supply hatches, and finally ejecting the Rover using the RCS Skycrane!

Finally, they are ready to leave the lander! until they are finally ready, and climb down the ladder! Summer goes first, then Lobert!

Immediately after the landing, the RCS Skycrane used to deploy the Rover fired, taking the vehicle up and away, landing nearby the Lander! Summer and Lobert discuss the plan: go to the lander, make sure it’s safe, then head out to look for the crater they need to study!

Lobert and Summer hike over to the rover!

The two Kerbals climb into the rover, and head off!

After driving (and dodging Mun rocks) Lobert spots a likely candidate, and Summer drives up to inspect it!

The scanner arm deploys and begins an analysis!

After stowing the scanner arm, the two Kerbals drive back to the lander!

The Kerbals climb inside the lander, and get into their space hammocks for a Mun-Nap!

Year 23, Day 328 (Aurora 29 Arrives at Mun – and Lobert Gets a Surprise!)

After just a day in space, Aurora 29 enters Mun’s gravitational sphere of influence!


Aurora 29 Mission Summary

  • Crew: Mission Commander Summer, Mission Scientist Gilian, Mission Engineer, Lobert .
  • Mission: Crewed mission to Mun. Land near Polar Mun Crater on Mun, perform scan with large scanning arm, return data to Kerbin.

This generation of Aurora Spacecraft perform a docking and transposition maneuver to utilize thrust from the Crew Vehicle to enter Mun orbit!

The Crew Vehicle docks with the lander!

The Munar Transfer stage, having done its job, detaches, and just the Crew Vehicle and the Lander head toward Mun!

Now it’s time to head down to Mun! The mission plan had Gilian and Summer heading down to the surface, but Gilian has a surprise!

Lobert suits up, and heads outside the ship!

After just another day Lobert and Summer will head down to Mun!

Year 23, Day 326 (Aurora 29 Departs for Mun!)

The Munar Transfer Stage fires, accelerating the crew toward Mun!


Aurora 29 Mission Summary

  • Crew: Mission Commander Summer, Mission Scientist Gilian, Mission Engineer, Lobert .
  • Mission: Crewed mission to Mun. Land near Polar Mun Crater on Mun, perform scan with large scanning arm, return data to Kerbin.

Year 23, Day 325 (Aurora 29 Launches for Mun!)

It’s going to be a dawn launch for Aurora 29!  Gene is supervising the final launch checks, listening to each department give a “Go!”


Aurora 29 Mission Summary

  • Crew: Mission Commander Summer, Mission Scientist Gilian, Mission Engineer, Lobert .
  • Mission: Crewed mission to Mun. Land near Polar Mun Crater on Mun, perform scan with large scanning arm, return data to Kerbin.

The Torodial Aerospike engine fires, then the Jool-Rocket derived Solids Rockets fire! Blast Off!

Aurora 29 lifts of the launchpad, lighting up the Space Center!

Rookie engineer Lobert is all smiles, excitedly waving his arms as the rocket blasts off!

Looking out the window, Lobert takes in the amazing view!

Aurora 29 rockets into the sky, breaking past the cloud layer and officially entering “Space!”

Aurora 2 continues its ascent, climbing above the atmosphere!

The fairing ejects, and Aurora 29 continues climbing to orbital altitude!

After circularizing orbit, the Neidon rocket separates from the Aurora 29 Crew Module, Lander, and Munar Transfer stage!

Year 23, Day 316 (Aurora 29 Begins Final System Checks!)

Ground crews around the Space Center begin final preparations for the launch of Aurora 29!

Among the changes:

  • Simulations showed that the Sarnus solid rocket boosters were insufficient for carrying the Aurora 29 paylod (due to the heavier Munar transfer stage.)  Heavier Jool Rocket boosters will be attached instead, with a few segments removed!
  • Multiple simulations and calculations have been done on the new Vincent Lander.  These have shown that the existing landing gear are insufficient for the craft’s high mass. A new landing gear system has been installed that should allievealleviate this issue for both Mun and Duna.  The margins to fit within a standard DSV bay remain very tight however.

Due to a small clerical error Edan, who was scheduled to be the engineer on the mission, has been replaced with new recruit Lobert, on his very first mission!  (Edan it seems is in cryogenic sleep on board the DSV Explorer, currently en-route to Sarnus!)

Lobert has been seen jumping and looking very excited for the mission!  Only a few lucky Kerbals get to be selected for the Space Program!