Year 23, Day 338 (Intrepid Returns Home from Moho!)

The crew of DSV-5 Intrepid wake up from their Cryo Sleep! As everyone starts to warm up, Mission Commander Sondo takes stock of the situation!


DSV 5 Intrepid – CM1 – Mission Summary

  • Crew: Mission Commander Carson, Mission Scientist Bob, Mission Engineer, Sondo .
  • Mission: Crewed mission to Mun. Land near Polar Mun Crater on Mun, perform scan with large scanning arm, return data to Kerbin.

As the powerful Colossus engine fires Intrepid slowly begins to close it’s trajectory, working to close its trajectory until orbit is achieved!

The RCS thrusters maneuver the ship aligning upright, and the engines fire again, briefly!

As Intrepid drifts around Kerbin it moves closer and closer toward Spacedock until…

As the massive Deep Space Vehicle slows its approach, Spacedock crews work to prepare the DSV docking ring! This will be the first time Spacedock 2 has had more than one DSV docked, and everyone is careful to follow safety procedures exactly after the disaster at the first Spacedock!

Leave a comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.