Year 6, Day 1 (Enterprise Upgrades KSS Power & Solar Systems!)

screenshot1763.pngVal and Chrisnic blast off in Enterprise, delivering the long promised second power and solar expansion to the station!  screenshot1765.png

Chrisnic, one of the most experienced engineers on the KSEA team will supervise the installation!

screenshot1768.png

The module remotely guides itself into position…

screenshot1769.png

Then Chrisnic leaves Enterprise to investigate!

screenshot1770.png

Deploying solar arrays!  Wow! These are huge!   Both deployed perfectly.  Returning to Enterprise!

-Chrisnic

screenshot1772.png

Enterprise departs!  The Heavy Cargo Shuttle will be trying something new today, landing at White Mesa!  The shuttle will then be flown back to the VAB for repairs and to be readied for its next launch!

screenshot1773.png

Enterprise does its “belly flop” manuever to slow down its reentry….

screenshot1774.png

Then glides to the runway!

screenshot1775.png

A great landing! Val and Chrisnic rest up for their next mission!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.